Every pit, every pipe, every case
Describe the network once: pipes, sizes and levels, valves, the supply and the pits. Then run as many demand cases as the design needs.
- Instantaneous peak flow (IPF) cases from the demand at each pit, by aircraft code.
- Loop-down and contingency cases: close a loop or a feeder and run again. The farthest pit for that case is recommended and included.
- Acceptance criteria you set: the farthest pit against the required pressure, shown as a green or red box.
- Velocity by duty: every pipe against the velocity limits of the applicable standards (EI 1585, NFPA 77).
- Colour by pressure or velocity on the plan, with each pit labelled.